Service 01
Air Flushing
A controlled flush that removes formaldehyde, VOCs and construction dust before occupancy. Standard 24-hour cycles, extended to 48 hours for LEED, WELL, EDGE and BERDE targets.
From day one Workspace indoor air quality
Air flushing and certified air purification for newly built and renovated offices. We clear the pollutants construction leaves behind — so your team walks into healthy air, not into a hazard.
Air flushing in progress — BGC fit-out
Protocols built around
What we do
A service for the building you are about to occupy, and the equipment that keeps it healthy afterwards.
Service 01
A controlled flush that removes formaldehyde, VOCs and construction dust before occupancy. Standard 24-hour cycles, extended to 48 hours for LEED, WELL, EDGE and BERDE targets.
Service 02
Our 2,000 CFM negative air machine combines a HEPA pre-filter stack with UV-C light and an ionizer to capture 99.97% of particles down to 0.3 µm — during fit-out and beyond.
Controlled ventilation, not just fans
Clean air at every stage
With years in office fit-out and facility management, we saw one step missing from most handovers: the air itself. Clean air is not a comfort upgrade — it is the last piece of construction work.
Equipment
A negative air machine that uses UV-C light and ion generator technology to clean fine particles thoroughly, with HEPA and pre-filter stages that capture 99.97% of particles.
How it runs
Every project follows the same four steps — with documentation you can hand to your landlord, your certifying body or your team.
We measure floor area, ceiling height and layout to calculate the air volume your flush needs to move.
Negative air machines and ducting are placed to create a controlled path for contaminated air to leave.
24 hours of continuous ventilation as standard, or 48 hours where LEED, WELL, EDGE or BERDE targets apply.
Air sampling confirms TVOC, formaldehyde and particulate levels before we hand the space back.
Verified, not assumed
We sample before and after the flush and report against recognised limits, so "the air is clean" becomes a number on paper.
| Parameter | Limit | After flush |
|---|---|---|
| TVOC | ≤ 1.0 ppm | < 0.1 ppm |
| Formaldehyde | ≤ 0.08 ppm | < 0.01 ppm |
| PM2.5 | ≤ 37.5 µg/m³ | 5.5–11.2 µg/m³ |
| PM10 | ≤ 50.0 µg/m³ | 17.1–39.7 µg/m³ |
Typical results from a completed office flush. Every project is sampled and reported individually.
By the numbers
Years in office fit-out and facility management
Continuous flush cycle per space
Particle capture at 0.3 µm
Air each person breathes through a working day
Air flushing FAQ
The questions facility managers ask us most often about preparing a newly fitted-out space for occupancy.
Send us your floor plan and move-in date — we will tell you what schedule your space needs.
Talk to our teamAir flushing is the final step in preparing a newly constructed or renovated office for occupancy. Run immediately after fit-out and before employees move in, it removes the pollutants that accumulate during construction.
By flushing out dust, volatile organic compounds and other airborne contaminants, air flushing makes sure employees enter a workspace with healthy air quality from day one.
Air flushing runs continuously for 24 hours as standard. Projects pursuing LEED, WELL, EDGE or BERDE certification need a 48-hour cycle to reach the required total air volume, so we plan the longer window from the start.
The process targets the substances generated during fit-out and renovation:
Skipping the flush leaves pollutants trapped indoors, where they can linger for weeks. That affects health, safety and productivity:
Immediately after fit-out construction is complete and before furniture, stock or people move in. Booked early, the flush fits neatly between your contractor's handover and your move-in date — and it can run overnight or across a weekend.
Send us your floor area and target occupancy date. We will confirm the air volume, the flush window and the equipment your space needs.