San Pedro, Laguna — serving Metro Manila & CALABARZON
Get a quote

From day one Workspace indoor air quality

Clean air for your workspace, from the first day.

Air flushing and certified air purification for newly built and renovated offices. We clear the pollutants construction leaves behind — so your team walks into healthy air, not into a hazard.

20+ years in fit-out and facilities LEED · WELL · BERDE ready San Pedro, Laguna
A negative air machine running inside a newly fitted-out office

Air flushing in progress — BGC fit-out

99.97%Particles captured at 0.3 µm
24–48 hoursContinuous flush cycle

Protocols built around

  • LEED
  • WELL
  • BERDE
  • EDGE
  • EPA-registered equipment
  • ASHRAE 62.1 flush volumes

What we do

Two ways we protect indoor air

A service for the building you are about to occupy, and the equipment that keeps it healthy afterwards.

Flexible ducting and air movers set up in an office under construction

Service 01

Air Flushing

A controlled flush that removes formaldehyde, VOCs and construction dust before occupancy. Standard 24-hour cycles, extended to 48 hours for LEED, WELL, EDGE and BERDE targets.

Technician connecting ducting to an ASUVION air scrubber

Service 02

ASUVION-2000 air scrubbing

Our 2,000 CFM negative air machine combines a HEPA pre-filter stack with UV-C light and an ionizer to capture 99.97% of particles down to 0.3 µm — during fit-out and beyond.

Air Solutions crew running ducting through an office during a flush Controlled ventilation, not just fans

Clean air at every stage

The air your team breathes is part of the build.

With years in office fit-out and facility management, we saw one step missing from most handovers: the air itself. Clean air is not a comfort upgrade — it is the last piece of construction work.

  • During construction — we control dust, pollutants and airborne hazards at the source.
  • Before handover — a full air flush delivers a clean, safe environment for day one.
  • During operations — portable purification keeps air quality steady as the space fills up.

Equipment

ASUVION-2000

A negative air machine that uses UV-C light and ion generator technology to clean fine particles thoroughly, with HEPA and pre-filter stages that capture 99.97% of particles.

  • Multilevel filtration — ultra-thick HEPA and pre-filter with a three-stage filter system.
  • 2,000 CFM airflow — adjustable from 800 to 2,000 CFM with overload protection and low power draw.
  • UV-C light and ionizer — a combined defence line for respiratory health, with a pressure gauge that tells you when to change filters.
  • 800–2,000 CFM
  • Up to 20,000 cu.ft.
  • 99.97% @ 0.3 µm
  • UV-C + ionizer
ASUVION-2000 negative air machine connected to a yellow flexible duct

How it runs

A flush, from survey to sign-off

Every project follows the same four steps — with documentation you can hand to your landlord, your certifying body or your team.

Site survey

We measure floor area, ceiling height and layout to calculate the air volume your flush needs to move.

Setup & containment

Negative air machines and ducting are placed to create a controlled path for contaminated air to leave.

Continuous flush

24 hours of continuous ventilation as standard, or 48 hours where LEED, WELL, EDGE or BERDE targets apply.

Verification

Air sampling confirms TVOC, formaldehyde and particulate levels before we hand the space back.

Before and after air quality sampling results for a completed air flush, showing TVOC, formaldehyde, PM2.5 and PM10 within acceptable limits

Verified, not assumed

Readings you can show the whole team.

We sample before and after the flush and report against recognised limits, so "the air is clean" becomes a number on paper.

Acceptable indoor air limits and typical post-flush readings
ParameterLimitAfter flush
TVOC≤ 1.0 ppm< 0.1 ppm
Formaldehyde≤ 0.08 ppm< 0.01 ppm
PM2.5≤ 37.5 µg/m³5.5–11.2 µg/m³
PM10≤ 50.0 µg/m³17.1–39.7 µg/m³

Typical results from a completed office flush. Every project is sampled and reported individually.

By the numbers

Built on experience, measured in air.

20+

Years in office fit-out and facility management

24–48h

Continuous flush cycle per space

99.97%

Particle capture at 0.3 µm

7,500L

Air each person breathes through a working day

Air flushing FAQ

Straight answers before you book.

The questions facility managers ask us most often about preparing a newly fitted-out space for occupancy.

Air Solutions technician working in an office

Still deciding?

Send us your floor plan and move-in date — we will tell you what schedule your space needs.

Talk to our team
What is air flushing?

Air flushing is the final step in preparing a newly constructed or renovated office for occupancy. Run immediately after fit-out and before employees move in, it removes the pollutants that accumulate during construction.

By flushing out dust, volatile organic compounds and other airborne contaminants, air flushing makes sure employees enter a workspace with healthy air quality from day one.

How long does air flushing take?

Air flushing runs continuously for 24 hours as standard. Projects pursuing LEED, WELL, EDGE or BERDE certification need a 48-hour cycle to reach the required total air volume, so we plan the longer window from the start.

Which pollutants are removed?

The process targets the substances generated during fit-out and renovation:

  • VOCs and formaldehyde — released by new carpets, furniture, paints and adhesives.
  • Particulate matter (PM10 and PM2.5) — fine dust and debris from construction materials.
  • Chemical odours — lingering smells from varnishes and industrial cleaners.
Why is it critical?

Skipping the flush leaves pollutants trapped indoors, where they can linger for weeks. That affects health, safety and productivity:

  • Respiratory protection — prevents inhalation of fine dust that can trigger asthma or bronchitis.
  • Chemical safety — reduces exposure to VOCs linked to headaches, dizziness and long-term health concerns.
  • Allergy prevention — removes fibres and particles that cause skin and eye irritation.
When should we schedule it?

Immediately after fit-out construction is complete and before furniture, stock or people move in. Booked early, the flush fits neatly between your contractor's handover and your move-in date — and it can run overnight or across a weekend.

Planning a fit-out or a move-in?

Send us your floor area and target occupancy date. We will confirm the air volume, the flush window and the equipment your space needs.